Incident Timeline
March 12, 2026
The EPA was reportedly notified of the deteriorating lead azide; the facility suspended operations around this period.
March 16, 2026
EPA personnel reportedly visited the site as the Army assessed response options.
March 30, 2026
Earlier reporting described a return to operations after safety review. This does not imply the lead azide itself had been disposed of.
Spring–September 2026
The Army evaluated options; conversation reporting refers to successive emergency storage permits and an ultimately preferred in-place detonation.
September 21, 2026
Day & Zimmermann announced Joshua Walsh as president of American Ordnance. No causal link to the incident was established.
October 15, 2026
A public Army meeting concerning disposal was scheduled, according to cited Army announcements.
November 13, 2026
The EPA emergency permit reportedly became effective.
November 19–21, 2026
The Army announced a postponed detonation and reporting described legal proceedings concerning the permit.
November 23, 2026
A proposed rescheduled detonation date, future as of this dossier’s November 22 compilation. This dossier does not claim that it occurred.